英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
biwtiko查看 biwtiko 在百度字典中的解释百度英翻中〔查看〕
biwtiko查看 biwtiko 在Google字典中的解释Google英翻中〔查看〕
biwtiko查看 biwtiko 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • ISIR (Initial Sample Inspection Report) vs. PSW (Part Sample Warrant)
    ISIR vs PSW I have read articals (can't remember which publications, but have seen it twice) when refering to Initial Sample Inspection Report (ISIR) it was followed by (Now PSW) PSW is Product Sample Warrant, but I fail to find documentation supporting the change from ISIR to PSW We submit numerous ISIR's to our automotive customers
  • Phased PPAP - The Elsmar Cove Quality Forum
    PSW, (14) Appearance Approval, and (17) Master Sample) Upon successful completion of the 16 of 19 elements, the supplier has met the Phase 1 requirement TIMING: This must completed in time to permit completion of Production Verification (Phase 2) prior to the In-Plant Date (IPD) for the 1PP vehicle build
  • PPAP Approval - Customer approval of PSW (part submission warrant)
    It all starts with what the customer requires A sign-off by the customer on the PSW by itself does not constitute a change in the previously agreed upon requirements You can not substitute PSW sign-off with determination of (new or changed) customer requirements Be cautious! The classic and safe answer is always: "When in doubt, ask the
  • PSW (Part Submission Warrant) and Design Requirements
    Part Submission Warrant includes the line which says: "These results meet all design requirements Y N" My question is that if some dimensions are out-of-spec on First Article Inspection, can we still put "Y" for it? Because while some dimensions are out, the part still has no issue in form
  • What is PSW - Statistical Process Package + Level 5
    Hello everyone, I have doubt regarding note inside PSW: Statistical process package Does that note mean SPC ?? Second question concerns PPAP level 5 What does it mean exactly ?? PPAP done by supplier plant but not sent to customer ?? To be checked on supplier plant only ?? Thanks in advance
  • PPAP requirements: Submission date and PSW (Statistical Process Package)
    Fantastic quote Ron, that just about sums up the PPAP process One key thing to mention, is that we now use a standard APQP timtable that consists of 5 gates
  • Safety and or Government Regulation question on a PSW (Part Submission . . .
    Strictly speaking, the field on the PSW pertains to regulations, and not necessarily self-declared safety concerns The best guidance on this would come from your customer, or whomever it was that put that on the drawing
  • Who in the supplier organization has to sign the PSW (Part Submission . . .
    PSW is a promise to the customer So we need to verify whether the process could satisfy the request before signing it Last edited by a moderator: Sep 16, 2013
  • List of Level 3 PPAP requirements for automotive suppliers
    Level 2 – PSW with product samples and limited supporting data; Level 3 – PSW with product samples and complete supporting data; Level 4 – PSW and other requirements as defined by the customer; Level 5 – PSW with product samples and complete supporting data available for review at the supplier’s manufacturing location





中文字典-英文字典  2005-2009